Floor Framing :
2" X 10" Floor Joist @ 16" o.c. or equivalent
2" X 10" Center Beam or equivalent
3/4" T & G oriented Strand Board Sub-Floor (or equal)
Construction Adhesive
Second Floor Ceiling Framing:
2" X 6" Box and Ceiling Joists @ 24" o.c.
12/12 cathedral in Great Room
Interior Wall Framing :
2" X 4" Wall Studs @ 16" o.c.
2" X 4" Top and Bottom Plates
Exterior Wall Construction :
2" X 6" Wall Studs @ 16" o.c.
2" X 6" Top and Bottom Plates (double top plate on side walls, single top plate on end
walls, single bottom plate both side and end walls)
(1) 2" X 12", (2) 2" X 12", (3) 2" X 12" door and window headers (bearing walls only)
Sheathing: 7/16" - 4' X 8' oriented strand board or equal
Siding: Standard siding varies by region and builder. A variety of options are available.
Marriage Wall Framing :
2" X 3" Wall Studs @ 16" o.c.
2" X 3" Top and Bottom Plates (double top plate, single bottom plate)
Insulation :
Flat Ceiling: Minimum R-30 batt insulation
Cathedral Ceiling: Minimum R-30 batt insulation
Sloped Ceiling: Minimum R-19 batt insulation
Exterior Walls: R-19 Kraft faced batt insulation
Exterior house wrap
Floors / Crawl Spaces / Basement Walls : Insulation furnished and installed by builder or
consumer to meet energy codes and requirements
Windows & Exterior Doors:
Tilt High Performance Vinyl Clad windows with Screens (Color: Green)
Triangle Windows in Gable End (STD Model)
Clear pine interior finish
1 3/4" Insulated Steel Doors
Locksets: Oil Rubbed Bronze lever handle with deadbolt
Roof System:
12/12 pitched trusses @ 24" o. c. (30 psf ground snow load)
1/2" oriented strand board or equal sheathing
15# felt underlayment w/ 6' of ice damming material
Landmark 40 architectural shingles
Shingle-Over Ridge Vent System
Soffit: 16" rough sawn red cedar w/ vent strip
Fascia: 1" X 6" rough sawn red cedar
Interior Stair Materials:
Cedar knewel posts, rails and spindles (per stair plans)
Plumbing:
Copper water lines with PVC drainage and venting
50 gallon electric water heater
1 - frost-proof hose bibb w/ vacuum breaker
Hot & cold riser supplied to 2 nd floor
PVC main drain supplied to upper level
Electrical:
200 amp electrical panels
PVC electrical conduit riser supplied to upper level
Copper wire
--Range---8 - 3 w/g
--120 v. circuit---12 - 2 w/g
--3-way switch leg---12 - 3 w/g
--Switch legs---12 - 2 w/g
--Clothes dryer---10 - 3 w/g
--GFI Circuit---baths and exterior recepts (1 front and 1 rear) and kitchen countertop recepts
Floor Covering:
Carpeting & Vinyl Tile
Wall and Ceiling Covering:
1 st & 2 nd floor: 8' ceilings - 5/8" gypsum wallboard or equal
Walls: 1/2" gypsum wallboard or equal
Latex primer paint finish on walls and ceilings
Interior Doors and Trim:
6 panel knotty pine doors w/ oil rubbed bronze lever sets
White Cedar hand hewn 1" x 5" casing for exterior doors & windows
Knotty Pine Base 1” x 6” and Casing: 1” x 4” (nominal dimensions)
Kitchen:
Portrait Maple natural style cabinets without soffit
Stainless steel sink with chrome pullout faucet
Vent-less range hood
Laminate countertop
All Bathrooms:
Vent fan & light combination
White china water closet
Venetian Bronze faucets & accessories
Owner Bath :
Portrait Maple vanity cabinet
Portrait Maple linen cabinet
Mirror & bath sconces
Double bowl countertop
60" fiberglass shower unit
Drop-in corner tub
Bath #1
Portrait Maple natural style vanity cabinet
Mirror & bath sconces
Single bowl countertop
Fiberglass tub/shower unit
Powder Room:
White china pedestal sink
24" flush mounted 1/8" mirror & bath sconce
Light Fixtures:
Hall----Ceiling fixture
Utility Room----Ceiling fixture
Over kitchen sink----Recessed lights
Kitchen ceiling----Recessed lights
Dinning Room----Chandelier
Walk-in closet----Ceiling fixture
Great Room----Switched recepts
Bedrooms----Ceiling fixture
Study----Ceiling fixture
Foyer----Recessed lights
Foyer----Wall sconces
Office----Ceiling fixture
Loft----Recessed lights
Front entrance----(1) coach lamp
Miscellaneous:
Doorbell
Washer/Dryer Hook-up (Not supplied in homes where W & D is located in basement)
Smoke detectors will be located in the vicinity of each bedroom and in each bedroom.
A wire will be furnished for field installation by others to the basement if applicable.
Notes:
Upper level is unfinished
Upper level finish materials furnished and installed by builder and/or consumer
Upper level ceiling insulation - min. R-19 with venting by others
Upper level sub-floor is not recommended as a finished floor